Nuclear Waste

choose a Category choose a Category

  • Reactor Reactor
  • Reactor (closed) Reactor (closed)
  • Interim storage (high level waste) Interim storage (high level waste)
  • Interim storage (radium-holding waste) Interim storage (radium-holding waste)
  • Repository (high level waste) Repository (high level waste)
  • Repository (radium-holding waste) Repository (radium-holding waste)

Sweden

Reactor

Ringhals 1 - 4

Ringhals-1

Current status: in operation
Commissioning:
1976
Type of reactor:
BWR
Capacity:
840 MW
Expected shut-down:
/

Ringhals-2

Current status: in operation
Commissioning:
1975
Type of reactor:
PWR
Capacity:
870 MW
Expected shut-down:
/

Ringhals-3

Current status: in operation
Commissioning:
1981
Type of reactor:
PWR
Capacity:
920 MW
Expected shut-down:
/

Ringhals-4

Current status: in operation
Commissioning:
1983
Type of reactor:
PWR
Capacity:
915 MW
Expected shut-down:
/

back