Nuclear Waste

choose a Category choose a Category

  • Reactor Reactor
  • Reactor (closed) Reactor (closed)
  • Interim storage (high level waste) Interim storage (high level waste)
  • Interim storage (radium-holding waste) Interim storage (radium-holding waste)
  • Repository (high level waste) Repository (high level waste)
  • Repository (radium-holding waste) Repository (radium-holding waste)

Sweden

Reactor

Forsmark 1 - 3

Forsmark-1

Current status: in operation
Commissioning:
1980
Type of reactor:
BWR
Capacity:
968 MW
Expected shut-down:
/

Forsmark-2

Current status: in operation
Commissioning:
1981
Type of reactor:
BWR
Capacity:
964 MW
Expected shut-down:
/

Forsmark-3

Current status: in operation
Commissioning:
1985
Type of reactor:
BWR
Capacity:
1155 MW
Expected shut-down:
/

back