Nuclear Waste

choose a Category choose a Category

  • Reactor Reactor
  • Reactor (closed) Reactor (closed)
  • Interim storage (high level waste) Interim storage (high level waste)
  • Interim storage (radium-holding waste) Interim storage (radium-holding waste)
  • Repository (high level waste) Repository (high level waste)
  • Repository (radium-holding waste) Repository (radium-holding waste)

Great Britain

Reactor (closed)

Chapelcross 1 - 4

Chapelcross-1

Current status: shut down
Commissioning: 1959
Capacity: 49 MW
Type of reactor: GCR (Magnox)
Expected shut-down: 2004

Chapelcross-2

Current status: shut down
Commissioning: 1959
Capacity: 49 MW
Type of reactor: GCR (Magnox)
Expected shut-down: 2004

Chapelcross-3

Current status: shut down
Commissioning: 1959
Capacity: 49 MW
Type of reactor: GCR (Magnox)
Expected shut-down: 2004

Chapelcross-4

Current status: shut down
Commissioning: 1960
Capacity: 49 MW
Type of reactor: GCR (Magnox)
Expected shut-down: 2004

back