Nuclear Waste

choose a Category choose a Category

  • Reactor Reactor
  • Reactor (closed) Reactor (closed)
  • Interim storage (high level waste) Interim storage (high level waste)
  • Interim storage (radium-holding waste) Interim storage (radium-holding waste)
  • Repository (high level waste) Repository (high level waste)
  • Repository (radium-holding waste) Repository (radium-holding waste)

France

Reactor

Chinon 1 - 3, B 1-4

Chinon-1

Current status: shut down
Commissioning:
1964
Capacity:
70 MW
Type of reactor:
GCR
Shut-down:
1973

Chinon-2

Current status: shut down
Commissioning:
1965
Capacity:
210 MW
Type of reactor:
GCR
Shut-down:
1985

Chinon-3

Current status: shut down
Commissioning:
1966
Capacity:
480 MW
Type of reactor:
GCR
Shut-down:
1990

Chinon-B1

Current status: in operation
Commissioning:
1984
Capacity:
905 MW
Type of reactor:
PWR
Expected shut-down:
/

Chinon-B2

Current status: in operation
Commissioning:
1984
Capacity:
905 MW
Type of reactor:
PWR
Expected shut-down:
/

Chinon-B3

Current status: in operation
Commissioning:
1987
Capacity:
905 MW
Type of reactor:
PWR
Expected shut-down:
/

Chinon-B4

Current status: in operation
Commissioning:
1988
Capacity:
905 MW
Type of reactor:
PWR
Expected shut-down:
/

back