Nuclear Waste

choose a Category choose a Category

  • Reactor Reactor
  • Reactor (closed) Reactor (closed)
  • Interim storage (high level waste) Interim storage (high level waste)
  • Interim storage (radium-holding waste) Interim storage (radium-holding waste)
  • Repository (high level waste) Repository (high level waste)
  • Repository (radium-holding waste) Repository (radium-holding waste)

France

Reactor

Blayais 1 - 4

Blayais-1

Current status: in operation
Commissioning:
1981
Capacity:
910 MW
Type of reactor:
PWR
Expected shut-down:
/

Blayais-2

Current status: in operation
Commissioning:
1983
Capacity:
910 MW
Type of reactor:
PWR
Expected shut-down:
/

Blayais-3

Current status: in operation
Commissioning:
1983
Capacity:
910 MW
Type of reactor:
PWR
Expected shut-down:
/

Blayais-4

Current status: in operation
Commissioning:
1983
Capacity:
910 MW
Type of reactor:
PWR
Expected shut-down:
/

back