Nuclear Waste

choose a Category choose a Category

  • Reactor Reactor
  • Reactor (closed) Reactor (closed)
  • Interim storage (high level waste) Interim storage (high level waste)
  • Interim storage (radium-holding waste) Interim storage (radium-holding waste)
  • Repository (high level waste) Repository (high level waste)
  • Repository (radium-holding waste) Repository (radium-holding waste)

Belgium

Reactor

Tihange 1 - 3

Tihange 1

Current status: in operation
Commissioning: 1975
Capacity: 962 MW
Type of reactor: PWR
Expected shut-down: 2015

Tihange-2

Current status: in operation
Commissioning: 1983
Capacity: 1008 MW
Type of reactor: PWR
Expected shut-down: 2022

Tihange-3

Current status: in operation
Commissioning: 1985
Capacity: 1015 MW
Type of reactor: PWR
Expected shut-down: 2025

back