Nuclear Waste

choose a Category choose a Category

  • Reactor Reactor
  • Reactor (closed) Reactor (closed)
  • Interim storage (high level waste) Interim storage (high level waste)
  • Interim storage (radium-holding waste) Interim storage (radium-holding waste)
  • Repository (high level waste) Repository (high level waste)
  • Repository (radium-holding waste) Repository (radium-holding waste)

West Russia

Reactor

Smolensk 1 - 4

Smolensk-1

Current status: in operation
Commissioning:
1983
Capacity:
925 MW
Type of reactor:
LWGR/RBMK
Expected shut-down:
/

Smolensk-2

Current status: in operation
Commissioning:
1985
Capacity:
925 MW
Type of reactor:
LWGR/RBMK
Expected shut-down:
/

Smolensk-3

Current status: in operation
Commissioning:
1990
Capacity:
925 MW
Type of reactor:
LWGR/RBMK
Expected shut-down:
/

Smolensk-4

Current status: Bau unterbrochen
Commissioning:
2012
Capacity:
925 MW
Type of reactor:
LWGR/RBMK
Expected shut-down:
/

back