Nuclear Waste

choose a Category choose a Category

  • Reactor Reactor
  • Reactor (closed) Reactor (closed)
  • Interim storage (high level waste) Interim storage (high level waste)
  • Interim storage (radium-holding waste) Interim storage (radium-holding waste)
  • Repository (high level waste) Repository (high level waste)
  • Repository (radium-holding waste) Repository (radium-holding waste)

Russia

Reactor

Leningrad 1 - 4, II1-2

LeningradII-1

Current status: Im Bau
Commissioning:
/
Capacity:
1200 MW
Type of reactor:
PWR/VVER
Expected shut-down:
/

LeningradII-2

Current status: Im Bau
Commissioning:
/
Capacity:
1200 MW
Type of reactor:
PWR/VVER
Expected shut-down:
/

Leningrad-1

Current status: in operation
Commissioning:
1974
Capacity:
925 MW
Type of reactor:
LWGR/RBMK
Expected shut-down:
2019

Leningrad-2

Current status: in operation
Commissioning:
1976
Capacity:
925 MW
Type of reactor:
LWGR/RBMK
Expected shut-down:
2022

Leningrad-3

Current status: in operation
Commissioning:
1980
Capacity:
925 MW
Type of reactor:
LWGR/RBMK
Expected shut-down:
2025

Leningrad-4

Current status: in operation
Commissioning:
1981
Capacity:
925 MW
Type of reactor:
LWGR/RBMK
Expected shut-down:
2026

back