Nuclear Waste

choose a Category choose a Category

  • Reactor Reactor
  • Reactor (closed) Reactor (closed)
  • Interim storage (high level waste) Interim storage (high level waste)
  • Interim storage (radium-holding waste) Interim storage (radium-holding waste)
  • Repository (high level waste) Repository (high level waste)
  • Repository (radium-holding waste) Repository (radium-holding waste)

USA

Reactor

Peach Bottom 1 - 3

Peach Bottom-1

Current status: shut down
Commissioning: 1967
Capacity: 40 MW
Type of reactor: HTGR
Shut-down: 1974 Peach Bottom-2

Current status: in operation
Commissioning: 1974
Capacity: 1110 MW
Type of reactor: BWR
Expected shut-down: /

Peach Bottom-3

Current status: in operation
Commissioning: 1974
Capacity: 1110 MW
Type of reactor: BWR
Expected shut-down: /

back