Nuclear Waste

choose a Category choose a Category

  • Reactor Reactor
  • Reactor (closed) Reactor (closed)
  • Interim storage (high level waste) Interim storage (high level waste)
  • Interim storage (radium-holding waste) Interim storage (radium-holding waste)
  • Repository (high level waste) Repository (high level waste)
  • Repository (radium-holding waste) Repository (radium-holding waste)

USA

Reactor (closed)

Elk River

Elk River

Current status: shut down
Commissioning:
1964
Capacity:
22 MW
Type of reactor:
BWR
Shut-down:
1968

back