Nuclear Waste

choose a Category choose a Category

  • Reactor Reactor
  • Reactor (closed) Reactor (closed)
  • Interim storage (high level waste) Interim storage (high level waste)
  • Interim storage (radium-holding waste) Interim storage (radium-holding waste)
  • Repository (high level waste) Repository (high level waste)
  • Repository (radium-holding waste) Repository (radium-holding waste)

East USA

Reactor

Enrico Fermi 1 - 2

Enrico Fermi-1

Current status: shut down
Commissioning:
1966
Capacity:
61 MW
Type of reactor:
FBR
Shut-down:
1972

Enrico Fermi-2

Current status: in operation
Commissioning:
1988
Capacity:
1139 MW
Type of reactor:
BWR
Expected shut-down:
/

back