Nuclear Waste

choose a Category choose a Category

  • Reactor Reactor
  • Reactor (closed) Reactor (closed)
  • Interim storage (high level waste) Interim storage (high level waste)
  • Interim storage (radium-holding waste) Interim storage (radium-holding waste)
  • Repository (high level waste) Repository (high level waste)
  • Repository (radium-holding waste) Repository (radium-holding waste)

East USA

Reactor

Cherokee 1 - 2

Cherokee-1

Current status: Bau verschoben
Commissioning:
/
Capacity:
1280 MW
Type of reactor:
PWR
Expected shut-down:
/

Cherokee-2

Current status: Bau verschoben
Commissioning:
/
Capacity:
1280 MW
Type of reactor:
PWR
Expected shut-down:
/

back